| Document Reference: | MUST-IT-POL-001 |
| Version: | 1.0 |
| Effective Date: | 2025 |
| Review Date: | Annually |
| Classification: | Internal – Restricted |
| Issued By: | Information Technology Department |
| Approved By: | Chief of Information Technology |
1. PURPOSE
This policy establishes the framework governing the backup of institutional data and the procedures for recovering systems and data following a disaster or significant disruption at Misr University for Science and Technology (MUST). The policy ensures business continuity, safeguards academic and administrative data, and defines roles and responsibilities for all stakeholders.
2. SCOPE
This policy applies to:
- All data systems, databases, servers, and applications operated by MUST
- All departments, faculties, and administrative units of the university
- Third-party vendors and cloud service providers handling MUST data
- Faculty, staff, students, and contractors who access or manage university information assets
3. DEFINITIONS
| Backup | A copy of data stored separately from the primary source to enable recovery in case of loss or corruption. |
| Disaster Recovery (DR) | The process of restoring IT systems and data to operational status following a disruptive event |
| Recovery Point Objective (RPO) | The maximum acceptable amount of data loss measured in time (e.g., 4 hours of data). |
| Recovery Time Objective (RTO) | The target time within which systems must be restored after a disruption. |
| Business Continuity Plan (BCP) | A strategic plan ensuring the university can continue critical operations during and after a disaster. |
| Incident | Any event that disrupts, or could disrupt, normal IT operations, including hardware failure, cyberattack, or natural disaster. |
| Hot Site | A fully operational off-site data center that can immediately take over operations. |
| Cold Site | A backup location with basic infrastructure but requiring setup time before operations can resume. |
4. POLICY OBJECTIVES
MUST is committed to:
- Ensuring availability and integrity of all critical university data
- Minimizing downtime and data loss in the event of a system failure or disaster
- Meeting defined RPO of no more than 4 hours for critical systems
- Achieving RTO of no more than 24 hours for core academic and administrative systems
- Complying with applicable laws, regulations, and accreditation standards
- Providing a tested, documented, and regularly reviewed disaster recovery capability
5. DATA CLASSIFICATION & BACKUP PRIORITY
5.1 Critical Data (Tier 1)
- Student academic records, transcripts, and grades
- Financial and payroll data
- HR records and employee data
- Active research data and funded project files
- University ERP/LMS databases
Backup Frequency: Every 4 hours (continuous). Retention: 7 years minimum.
5.2 Operational Data (Tier 2)
- Email and communications systems
- Administrative documents and reports
Faculty and departmental files Backup Frequency: Daily. Retention: 3 years
5.3 Standard Data (Tier 3)
- General user files and shared drives
- Non-critical system configurations
- Website content and digital assets Backup Frequency: Retention: 1 year.
6. BACKUP PROCEDURES
6.1 Backup Methods
- Full Backup: Complete copy of all selected data – performed weekly (every Sunday at 02:00 AM)
- Incremental Backup: Only data changed since the last backup – performed daily (Monday–Saturday at 02:00 AM)
- Differential Backup: Data changed since last full backup – used for critical systems as supplementary measure
6.2 Backup Storage
- On-site storage: Primary backup server located in the university data center
- Off-site storage: Encrypted backup replicated to a geographically separate facility
- Cloud backup: A cloud-based secondary copy maintained for Tier 1 and Tier 2 data
- Encrypted media: All physical backup media encrypted using AES-256 standard
6.3 Backup Verification
- Automated integrity checks run immediately after each backup cycle
- Monthly manual restore tests conducted by IT staff for each Tier
- Results logged and reviewed by the IT Director
7. DISASTER RECOVERY PLAN
7.1 Disaster Declaration
A disaster may be declared by the IT Director or University President when an incident disrupts critical operations for more than 2 consecutive hours, or when it is determined that recovery cannot be achieved through standard IT support procedures.
7.2 Disaster Recovery Team
| Role | Responsibility | Contact Tier |
| DR Coordinator (IT Director) | Overall coordination of DR activities | Primary |
| Systems Administrator | Server and infrastructure recovery | Primary |
| Network Engineer | Network and connectivity restoration | Primary |
| Database Administrator | Database restoration and validation | Primary |
| IT Security Officer | Security assessment post-incident | Secondary |
| University President / VP | Executive decision-making & communication | Executive |
| Finance Director | Budget authorization for DR expenses | Executive |
| Communications Officer | Internal/external stakeholder updates | Support |
8. TESTING & MAINTENANCE
MUST shall conduct the following DR tests on a regular schedule:
| AnnuallyTest Type | Frequency | Owner |
| Backup Restore Test | Monthly | Systems Admin |
| Tabletop Exercise | Quarterly | DR Coordinator |
| Full DR Simulation | Annually | IT Department |
| Business Continuity Review | Annually | IT Director + VP |
9. SECURITY & COMPLIANCE
- All backup data must be encrypted at rest (AES-256) and in transit (TLS 2 or higher)
- Access to backup systems is restricted to authorized IT personnel only
- Backup logs are retained for a minimum of 12 months
- Compliance with Egyptian data protection regulations, ISO/IEC 27001, and applicable accreditation standards is mandatory
- Any breach of backup data must be reported to the IT Security Officer within 2 hours of discovery
10. ROLES & RESPONSIBILITIES
IT Director: Owns this policy; ensures adequate resources for backup and DR; reports to university leadership.
IT Staff: Executes backup procedures; monitors success/failure; escalates issues; performs restore tests.
Department Heads: Identify critical data within their units; cooperate in DR exercises; ensure staff compliance.
University President / VP: Approves DR declarations; allocates emergency resources; communicates with external stakeholders.
All Staff & Faculty: Comply with data handling requirements; report data loss incidents promptly.
11. POLICY REVIEW & VERSION CONTROL
This policy shall be reviewed annually by the IT Director and updated as required to reflect changes in technology, regulatory requirements, or university operations. All amendments require approval by the University President.